Titusville, Florida
| ||||||||||||||||||||||
All sections are 20 feet in length. The first section is usually assembled on
the foundation prior to the arrival of the crane to make sure it will fit. You
don
’t want to “make a pick” with the crane only to find the anchor bolts are in the wrong place.
| ||||||||||||||||||||||
We build the sections on their sides and bolt several together before the lift.
One man bolts each leg pad together then moves up to the next level.
| ||||||||||||||||||||||
The leg bolts are in the canvas bag hanging at the bottom of the section being
lifted.
| ||||||||||||||||||||||
Top sections going up.
| ||||||||||||||||||||||